OUR BUSINESS


AUDIT SERVICES
CONSULTING SERVICES
Earthing Study is the engineering process JEF Techno uses to protect structures, equipment and personnel, delivered in compliance with IS/IEC 62305.
Earthing Study reduces the risk of equipment damage, downtime, fire and injury caused by lightning strikes, earth faults or transient overvoltages in industrial and commercial facilities.
In India, earthing study follows IS/IEC 62305 and IS 3043; internationally JEF Techno also aligns with NFPA 780, IEEE 80 and IEC 62561 depending on the project location.
Cost depends on facility size, soil/site conditions and scope; JEF Techno provides a free site assessment and itemized quote before starting earthing study.
A typical earthing study project takes 2-6 weeks from site survey to commissioning, depending on facility size and site access.
Factories, warehouses, data centers, substations, telecom towers, solar plants, commercial buildings and any facility handling critical or high-value equipment.
JEF Techno recommends annual inspection of soil resistivity testing, with a full re-assessment every 3-5 years or after any major structural change.
Yes — earthing study is commonly retrofitted; JEF Techno's team conducts a site survey to adapt the design to existing structural and access constraints.
Earthing Study focuses on engineering study service covering soil resistivity testing, earth grid/mesh design, touch & step potential calculation and earthing system simulation for substations and industrial plants, while soil resistivity testing addresses a related but distinct engineering requirement — our consultants advise which (or both) your facility needs.
Yes, JEF Techno delivers earthing study across the Middle East (UAE, Saudi Arabia, Qatar, Oman, Kuwait, Bahrain) and Southeast Asia (Singapore, Malaysia) in addition to India.
A compliance report, test certificates, as-built drawings and a maintenance schedule are provided on completion.
Many jurisdictions require earthing study for industrial, high-occupancy or hazardous-area buildings under local fire/electrical codes — JEF Techno can confirm the exact requirement for your facility's location.
Industry-standard tools such as ETAP, CDEGS/XGSLab and proprietary risk-assessment calculators aligned to IS/IEC 62305 are used for simulation and design.
Manufacturing, oil & gas, data centers, warehousing/logistics (including clients such as Amazon), EPC/construction (L&T), agrochemicals (Syngenta), renewable energy and utilities.
JEF Techno typically quotes per site/facility based on scope, with fixed-fee options available for multi-site or annual maintenance contracts.
Earthing Study is the engineering process JEF Techno uses to protect structures, equipment and personnel, delivered in compliance with IS/IEC 62305.
Earthing Study reduces the risk of equipment damage, downtime, fire and injury caused by lightning strikes, earth faults or transient overvoltages in industrial and commercial facilities.
In India, earthing study follows IS/IEC 62305 and IS 3043; internationally JEF Techno also aligns with NFPA 780, IEEE 80 and IEC 62561 depending on the project location.
Cost depends on facility size, soil/site conditions and scope; JEF Techno provides a free site assessment and itemized quote before starting earthing study.
A typical earthing study project takes 2-6 weeks from site survey to commissioning, depending on facility size and site access.
Factories, warehouses, data centers, substations, telecom towers, solar plants, commercial buildings and any facility handling critical or high-value equipment.
JEF Techno recommends annual inspection of soil resistivity testing, with a full re-assessment every 3-5 years or after any major structural change.
Yes — earthing study is commonly retrofitted; JEF Techno's team conducts a site survey to adapt the design to existing structural and access constraints.
Earthing Study focuses on engineering study service covering soil resistivity testing, earth grid/mesh design, touch & step potential calculation and earthing system simulation for substations and industrial plants, while soil resistivity testing addresses a related but distinct engineering requirement — our consultants advise which (or both) your facility needs.
Yes, JEF Techno delivers earthing study across the Middle East (UAE, Saudi Arabia, Qatar, Oman, Kuwait, Bahrain) and Southeast Asia (Singapore, Malaysia) in addition to India.
A compliance report, test certificates, as-built drawings and a maintenance schedule are provided on completion.
Many jurisdictions require earthing study for industrial, high-occupancy or hazardous-area buildings under local fire/electrical codes — JEF Techno can confirm the exact requirement for your facility's location.
Industry-standard tools such as ETAP, CDEGS/XGSLab and proprietary risk-assessment calculators aligned to IS/IEC 62305 are used for simulation and design.
Manufacturing, oil & gas, data centers, warehousing/logistics (including clients such as Amazon), EPC/construction (L&T), agrochemicals (Syngenta), renewable energy and utilities.
JEF Techno typically quotes per site/facility based on scope, with fixed-fee options available for multi-site or annual maintenance contracts.